Construction of the new bridge in Trilj
Due to the fact that the construction of the iron bridge complicated the river flow, in 1934/35, preparations for the construction of a concrete bridge began, at the location where the bridge across the Cetina River lies today. The bridge was opened for traffic on January 1st, 1938.